Saturday, February 7, 2009

PDMS COMMANDS: PIPING COMMANDS

PDMS COMMANDS

PIPING COMMANDS

1. ADD ALL PIP


2. REM ALL PIP


3. MOVE U THROU IDP@


4. MOVE E THROU IDP@


5. MOVE W THROU IDP@


6. MOVE N THROU IDP@


7. MOVE S THROU IDP@


8. Q DTXR (To See Name Of Component)


9. Q STEXT


10. STEXT ‘NOTE’ (Naming For Attachment)


11. Q ATT (To see the attributes)


12. REPR INSU ON/OFF UPDATE


13. Q ISPEC (To see the insulation)



14. ISPEC NULREF (To Remove the Insulation)



15. CONN NEXT (Connection to next element)



16. FCONN (For force connection)



17. DIST 500



18. AXES AT PH (To see Axes of Pipe Head)



19. AXES AT PT (To see Axes of Pipe Tail)



20. AXES OFF



21. BY U 500



22. BY D 500



23. BY E 500



24. BY W 500



25. BY S 500



26. BY N 500



27. Q NAME



28. ROTATE BY 45 (Rotated command)

29. ROT BY 90 ABOUT Z THRO ID@ (Rotated)

30. Q PARA (To check nozzle size)

31. Q CATREF (To See nozzle Rating)

32. Q POS IN WORLD

33. CH CE (check current element)

34. Q SPREF (check piping Spec)

35. Q ORI (To see the orientation)

36. DIR D (Direction Down) U E W N S (For elbow, tee, valve)

37. Q P1/P2/P3 (To see pipe Bore Direction Connection type and Position)

38. Q HBORE

39. Q TBORE

40. Q LBORE

41. NEW BRA COPY PREV BY E/W/S/N/U/D 100

42. Q U (To see the elevation)

43. Q ANGLE (For change the angle)

44. THRO NEXT (To connect element to next component)

45. Q LTLE (To cheek pipe length)

46. Q MEM

47. Q RTEX OF DETREF (To see element type and detail)

48. CONN IDP@ TO IDP Q CE

49. Q PL (For Direction and position)

50. BRA CONN PH TO FIST MEM

51. BRA CONN PT TO NOZZ ID@

52. BRA CONN PT TO LAST

53. RAD 500 (Control Valve Radius)

54. HEI 500 (Control Valve Height)

55. BACK (Backward)

56. FORW (Forward)

57. For Drain pipe

a. ADD ATT (For isometric note)

b. Q ATT

c. TCONN OPEN

d. Q STEXT

e. STEXT ‘DRAIN POINT’

58. For Slope Line /Rotated Elbow

a. FORWARDS (Select in piping components)

b. DIR TOW NEXT

c. BACKWARDS (Select in piping components)

d. DIR TOW NEXT

59. MTOC DOTD (Do not want in bill of material) You can see the Doted DOTD

60. MTOC ON (Want in bill of material)

61. MTOC OFF (Don’t Want in bill of material)

62. Q PA BOP/TOP (To see the pipe BOP/TOP)

63. Q LSTUBE (To Change the spec Brake)

64. Q PSPEC (To see the pipe spec)

65. CONN PH TO P3 OF ID@ ( AND SELECT THE PIPE P3)

66. CONN PT TO LAS MEM

Courtesy : Anand Todkar

Get Notified for new Tutorials:
*Check your email to confirm your subscription*


4 comments :

 

© 2011 PIPING GUIDE - Designed by Ankit | ToS | Privacy Policy | Sitemap

About Us | Contact Us | Write For Us