ASME Codes and Standards:
B16.5 - Pipe Flanges and Flanged Fittings
B16.24 - Bronze Flanges and Fittings–150 and 300 Classes
A Unique blog for Oil and Gas Professionals covering topics related to Piping and Process.
Definition of Petroleum as per the Act.
Any liquid hydrocarbon or mixture of hydrocarbons or any inflammable mixture (liquid, viscous/solid containing any liquid hydrocarbon.)
Classification of Petroleum : -
This is based on flash point.
Typical petroleum products under each class are given i 11 bracket.
Class A - flash point less than 230C (LPG)
Class B - flash point 23 0C or more but less than 650C (HSD, Kerosene)
Class C - flash point 650C or more but less than 930C (Furnace Oil, LSHS, LSGR)flash point 930C or more -not covered under Act.
ASME Codes give stipulations and guidelines for the design. materials, manufacture and testing of pressure vessels. These are issued by the American Society of Mechanical Engineers. New York.
The codes were first issued in 1915. Since then, many changes have been made and new sections added to the code as need arose. It is a Live code and is revised and updated periodically. It keeps pace with time and is responsive to its users.
i. These are statutory rules and come under the purview of Chief Controller of Explosives based in Nagpur. This is a Central Government Authority for whole of India. The regional offices of ‘CCE’ are located in each region. However, these regional offices do not have authority to approve the installations. They can only be consulted on matters relating to these regulations. The Authority for approval of the installations is vested only in the Chief Controller of Explosives (CCE) based in Nagpur.
ii. All liquid hydrocarbons (and some of the non-hydrocarbons as per the list available in the CCE’s Nagpur and other Regional Offices) falling in classes A, B, & C are required to be stored as per these rules. Hence the storages falling under the purview of these rules must be segregated from other flammable I non flammable liquids at the plot plan stage itself. This is a must from space allocation point of view also as the’ CCE’ storages require lot of space.